On the Critical Path
Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.
In brief
On the Critical Path (1971) is a documentary film. With an average rating of 7.0/10 from 1 votes, it's a solidly rated pick. The film runs 22min. Check current streaming availability in the "Where to watch" section above.
Frequently asked questions
Where can I watch On the Critical Path online?
We're currently checking availability of On the Critical Path across streaming services. Availability varies; it's worth checking major platforms such as Netflix, Max and Prime Video.
How long is On the Critical Path?
On the Critical Path runs 22 minutes (22min).
What rating does On the Critical Path have?
On the Critical Path has an average rating of 7.0/10 based on 1 viewer votes on TMDB.
What year is On the Critical Path from?
On the Critical Path was released in 1971.
Similar Films
Movies
The New Fire
2017
Uranium Drive-In
2013

Radioactive: The Women of Three Mile Island
2024
Th (Part 11: Dr. Helen Caldicott)
2014
Developing Tomorrow’s Energy
1980

Wolsong: Vanishing Town
2019

The Atom: A Love Affair
2019

Sista varningen!
1980
Douglas Point Nuclear Power Station: Design and Construction
1969
Nuclear Power Demonstration
1963